Ponto Dr. & Avenida Encinas
Carlsbad, CA
-

BACKGROUND
As requested by the City of Carlsbad, MTJ provided a peer review of existing proposed roundabout design and developed optimized horizontal redesign recommendations. The MTJ redesign addressed contextual issues, to include appropriate transitions to the existing Avenida Encinas cross sections.
-
SUMMARY
MTJ’s geometric peer review and optimized redesign addressed these issues:
Insufficient speed control criteria, aka Fast Path Analysis/Deflection
Excessively wide circulating widths at the quadrant locations
Design transitions to tie into existing cross section to the north as it relates to the existing left turn lane, and associated cross section markings for both vehicular and bike lanes
Lane continuity/transition issues for the south leg tie-in and transition to the existing signalized intersection to the south at Carlsbad Blvd. to maintain correct operations
The MTJ recommended 107′ ICD optimized geometric design addressed all the defined deficiencies within available constraints
Highlights
107′ ICD optimized geometric design
Lane continuity transitions
Addresses existing cross sections
Avoids adverse ROW impacts
Ped/bike safety facilitation
Large truck/freight accommodations