    The Road Commission of Oakland County needed a solution to improve safety, access and traffic flow in the corridor along Baldwin Road. The revitalization project includes a 5-roundabout corridor that will be phased. Phase 1 will include the intersections of Baldwin and Judah and Gregory Roads.

  • SUMMARY

    MTJ Roundabout Engineering, working with OHM, provided optimized final horizontal geometrics that addressed several issues:

    -Phi and view angles to the left

    -Speed control at pedestrian crossing locations

    -“Intersection angle”

    -Safety – allowing for landscaping and/or other screening design features within splitter islands

Highlights

  • 5-roundabout corridor

  • Improved pedestrian safety

  • Maintained business access

  • Revitalization process