4th St. / Cedar Ave. / Lockett Rd.
Flagstaff, AZ
-

BACKGROUND
The City of Flagstaff retained MTJ (as part of the AZTEC team) to evaluate the feasibility of a roundabout application at this highly constrained site. The intersection is located adjacent to elementary/middle school, college, commercial and residential uses.
-

SUMMARY
MTJ Roundabout Engineering developed two geometric designs for evaluation of feasibility. The double-roundabout avoids residential impacts; whereas, the 4-legged roundabout impacts one residence.
Each design achieves operational, accessibility and safety objectives for all modes – vehicular, pedestrian, and cyclists.
Design highlights:
Horizontal designs that minimized adverse impacts to surrounding context
Designs highlighting safety for all modes
Sensitivity analysis to reflect accommodation of future traffic growth
Highlights
Highly constrained context
Multimodal safety priority
Minimization of adverse impacts, including residential traffic flow
4-leg and double-roundabout alternatives