Town Line Rd. & Good Hope Rd.

Lannon, WI

MTJ Roundabout Engineering provided the analysis, design, peer review for 30/60/90% plans, and public outreach support to WisDOT for this existing roundabout.

This challenging project includes high-speed approaches in a transitional/ex-urban setting. Key to this effort was developing a design that was sensitive to ROW impacts and replacing an existing two-way stop. This allowed safe residential drives to exist to ensure safety and access for all modes of travel.

MTJ’s extensive design experience played a pivotal role in achieving the correct design solution and acceptance of this unique roundabout application. MTJ worked as a sub-consultant to One Source Consulting.

HIGHLIGHTS

  • Ex-urban/transitional context
  • High-speed approaches
  • OSOW accommodations

Back to Projects