This roundabout, located in front of the Wisconsin DOT District 4 Office, was opened in 2004. A major component of this design was keeping impacts low on surrounding businesses, including two gas stations. Through use of a “K-style” design, commonly applied with roundabouts requiring more than four legs, impacts were kept to a minimum while insuring convenient access to the pumps.
MTJ Roundabout Engineering was responsible for the Final Horizontal Geometry, Signing and Pavement Marking Design, and Field Layout for this project.