Murdock Dr. & STH 76 / USH 45

Oshkosh, WI

BACKGROUND/CONTEXT

The city of Oshkosh needed to make changes to this congested intersection to improve traffic flow and safety for all modes while enhancing business access.

RESULTS

MTJ Roundabout Engineering was the designer/reviewer responsible for capacity analysis and final horizontal geometrics.

The selected solution for this intersection was a high-capacity, multi-lane entry roundabout designed for safety of all modes.

This roundabout opened in 2010.

HIGHLIGHTS

  • Urban multi-lane
  • Highly constrained
  • Business access

Back to Projects